Review 

  1. Which of the following are account codes used to track?

    1. Quantity

    2. Budget

    3. Account Code Tags

    4. Unit Costs

    5. a, b, and d

    6. All of the above

  2. Manual entry in the Primary Qty and Secondary Qty fields is one of the methods for defining primary and secondary quantities for ________?

    1. Change Attribute

    2. UOM's

    3. Account Codes

    4. Unit Rates

    5. Total Cost

Summary 

As a result of this lesson, you can:

  • Assign account codes to cost items

  • Define the quantity contribution for each account code

  • Review and analyze the audit log